MUMBAI-DCPR

Mumbai DCPR-2034: Guide for Architects & Draftsmen

Mumbai DCPR-2034

A Comprehensive Guide for Architects & Draftsmen

Navigating the Development Control and Promotion Regulations for Greater Mumbai (Effective 13.11.2018, Updated up to 07.12.2018). This guide highlights key provisions impacting design, planning, and execution.

Core Goals & Vision of DCPR-2034

📈

Maintain Economic Primacy

Why: Accommodate future employment, offer competitive office rentals.

How: Increase FSI, redevelop mill lands, convert industrial plots, special FSI for IT/FinTech.

🏘️

Slum-Free Mumbai & Housing for All

Why: Address housing shortage, especially for EWS/LIG.

How: Inclusionary Housing, Affordable Housing on SDZ, Reserved AH plots.

🌿

Enhanced Environment & Quality of Life

Why: Tackle deficit of public open spaces & amenities.

How: Accommodation-Reservation, Compensatory TDR, Mandatory contribution from large plots.

FSI & Development Potential (Reg. 30, 31, 32)

FSI Computation Basis

+

FSI is computed on gross plot area excluding road widening/DP road/regular line for base FSI. However, areas for RG, amenity open space (Reg. 14A), and reservation (Reg. 17) are included for loading Premium FSI & TDR.

New FSI Regime

+
  • Components: Zonal Basic FSI + Additional FSI on payment of Premium + Transferable Development Rights (TDR).
  • Premium for Additional FSI (Reg. 30 Note 6): 50% of ASR (for FSI 1). Shared 25% each: State Govt., MCGM, MSRDC, Dharavi Authority. (Note: Recent notifications may have temporarily reduced these rates).

Fungible Compensatory Area (Reg. 31(3))

+
  • Permitted up to 35% for residential/industrial/commercial over admissible FSI.
  • Premium: 50% ASR for Residential, 60% for Industrial/Commercial. Shared: 50% MCGM, 30% State Govt, 20% MSRDC. (Note: Recent notifications may have temporarily reduced these rates).
  • No Premium: For rehab components in various schemes (Reg. 33(7), 33(10), etc.), existing BUA in Reg. 33(5), 33(6), 33(7B), and Reg. 33(15). 50% rebate for Reg. 33(2) (excl. private medical). No premium for Reg. 33(3) (MCGM/State Govt.).

Max Permissible FSI (Linked to Road Width - Reg. 30, Table 12)

+

Island City: Up to 3.0 (Roads ≥27m)

Suburbs & Extended Suburbs: Up to 2.5 (Roads ≥27m)

Note: For roads <9m in Suburbs, total FSI is 1.0.

Transferable Development Rights (TDR - Reg. 32)

+
  • Generation: 2.5x area (Island City), 2.0x area (Suburbs) for surrendered reserved land/DP roads. Bonus for early surrender. 50% TDR for CRZ/BDP/HTHS areas.
  • Construction Amenity TDR: (Construction Cost ASR / Land Rate ASR) * 1.5 * BUA of amenity.
  • Utilization: X = (Rg/Rr) * Y.
  • Slum TDR: Min 20%, Max 50% of TDR component must be Slum TDR.

Redevelopment Schemes (Reg. 33, 14B, 35)

Consent Clause

+
  • Cessed Buildings/MHADA (Reg. 33(7)(2)1.(a), Reg. 33(5)7)a)): 51% of occupiers.
  • Private Co-op. Societies (Reg. 33(6)2.): 70% of members.

Cessed Buildings - Island City (Reg. 33(7))

+
  • FSI: 3.00 or Rehab FSI + 50% Incentive FSI (up to 70% for 6+ plots or high density).
  • Min. Rehab Carpet Area: 27.88 sqm (300 sqft), Max up to 120 sqm (cost for excess by tenant).
  • MHADA Share: Surplus BUA as per MHAD Act, 1976.

Dilapidated/Unsafe Non-Cessed Buildings (Reg. 33(7A))

+
  • FSI: Rehab FSI + 50% Incentive FSI (up to 70% for 6+ plots).
  • Min. Rehab Carpet Area: 27.88 sqm (300 sqft), Max up to 120 sqm (cost for excess by tenant).

Existing Co-op. Housing Societies (Reg. 33(7B))

+

(Excl. 33(7) & 33(7A), building age ≥30 years)

  • Incentive BUA: 15% of existing BUA or 10 sqm/tenement (whichever is more), without premium.
  • Balance FSI up to permissible limit via Premium FSI/TDR.

Slum Rehabilitation Schemes (SRS) (Reg. 33(10))

+
  • Min. Rehab Carpet Area: 27.88 sqm (300 sqft).
  • Max Permissible FSI: 4.0 or (Rehab FSI + Incentive FSI), whichever is more. In-situ FSI up to 3.0 (road 9m to <13m) or 4.0 (road ≥13m).
  • Incentive FSI: 0.8 to 1.35 times rehab BUA (based on scheme size & LR/RC ratio).
  • Min. Density: 650 tenements/Ha (relaxable to 500/Ha). Balance tenements to SRA.

Dharavi Notified Area (DNA) (Reg. 33(10A))

+
  • Overall FSI 4.00.
  • Rehab Carpet Area: 27.88 sqm (300 sqft) free. For existing >27.88 sqm, rehab is 37.16 sqm (400 sqft) with cost for additional 9.29 sqm.

MHADA Colonies (Reg. 33(5))

+
  • New Schemes (EWS/LIG/MIG): FSI 3.0 (up to 4.0 for plots >4000 sqm on roads ≥18m). Min 60% BUA for EWS/LIG/MIG.
  • Redevelopment: FSI 3.0 (up to 4.0 similarly).
  • Rehab Entitlement: Basic (Existing Carpet Area + 35%, min 35 sqm) + Additional (15%-45% of existing, based on plot size).
  • Incentive FSI: 40%-70% of rehab area, based on LR/RC ratio.
  • MHADA Share: Remaining FSI shared (MHADA gets 55%-70%).

Industrial to Residential/Commercial Conversion (Reg. 14B)

+
  • Premium: 20% of ASR (50% to Govt). NOC from Labour Commissioner.
  • Amenity Handover: Sliding scale based on plot size (e.g., <2000 sqm: 10% open land or 5% BUA; ≥2000 sqm - 2Ha: 10% land as POS).
  • 20% of residential BUA for tenements ≤50 sqm. Min 20% of residential BUA for commercial use.

Cotton Textile Mills (Reg. 35)

+

(Several clauses kept in abeyance)

  • Sharing (Sick/Closed Mills - Historical): 33% POS, 33% MHADA, 34% Owner.
  • Chawl Rehab: 405 sq ft (37.63 sqm) carpet area. FSI 4.0 on notional plot. Surplus FSI shared.

Amenities & Open Spaces

Mandatory Contribution for Amenities (Reg. 14A)

+

(For plots ≥4000 sqm in Resi/Comm zones, excl. road setback/DP road)

  • Plots 4000-10,000 sqm: Handover 5% of plot area as POS.
  • Plots >10,000 sqm: Handover 500 sqm + 10% of (plot area - 10,000 sqm). (50% for POS, 50% for built amenities).
  • FSI of handed-over plot allowed on remaining plot.
  • Transitional Policy options apply if unable to provide.

Accommodation Reservation (AR) (Reg. 17 & Table 5)

+
  • Plots ≥1000sqm: Owner develops X% BUA + hands over Y% land to MCGM. Develops (100-Y)% land.
  • Plots <1000sqm: As above, or construct X% BUA (no separate plot) with premium for not handing Y% land.
  • Refer Table 5 for X & Y values (e.g., School: X=50, Y=50; PG: Y=70).
  • Developer gets BUA/TDR for construction cost: 1.5 * (Construction Rate / Land Rate) * BUA of amenity. (50% for PPL).

Layout Open Space (LOS) / RG (Reg. 27)

+
  • Residential/Commercial: 15% (1001-2500sqm), 20% (2501-10000sqm), 25% (>10000sqm).
  • Industrial (≥1000sqm): 15%.
  • Min. 60% of LOS on ground; min. 50% of this on mother earth. Balance 40% on podium.
  • Structures in LOS: Utilities (LOS >400sqm, up to 10% area). Pavilions, clubs (LOS ≥1000sqm, up to 15% BUA of LOS).

Key Design & Planning Norms

Important Definitions (Reg. 2(IV))

+
  • FSI (61): Gross floor area / Plot area.
  • BUA (19): Covered area on all floors, incl. cantilevers, excl. FSI exemptions.
  • Carpet Area (22): As per RERA 2016.
  • Habitable Room (71): For human habitation; excludes bath, WC, pantry, corridor etc.
  • High-Rise Building (75): Height > 32m.
  • Special Building (17)(n): Assembly >1000sqm BUA, Industrial, Hazardous, Wholesale, Edu/Inst/Hotel >15m or >1000sqm BUA.

Min. Road Width for Building Access (Reg. 19(2))

+
  • High Rise (>32m-70m): 9m. (>70m-120m): 12m. (>120m): 18m.
  • Special/Assembly (>32m): 18m.
  • Relaxations for specific rehab schemes.

Parking Standards (Reg. 44)

+
  • Residential: Varies by carpet area (e.g., 1 per 4 ten. ≤45sqm). +25% visitor. Relaxed for rehab.
  • Commercial (Offices): 1 per 37.5sqm up to 1500sqm, then 1 per 75sqm.
  • Retail/Malls: 1 per 40sqm up to 800sqm, then 1 per 80sqm.
  • Size: Car 2.5x5.5m. Scooter 3sqm.

Marginal Open Spaces (Reg. 41)

+
  • Side & Rear (Plot >1000sqm & W/D >20m): Varies with height (e.g., Ht ≤32m: H/4, min 3.6m Resi, 4.5m Comm).
  • Front Setback: 3m to 6m based on road width & location.

Heights of Habitable Rooms (Reg. 37(2))

+
  • Min Height (Flat Roof): Habitable 2.75m. Bath/WC 2.2m. Assembly/Hotel/Edu/Ind: 3.6m.
  • Max Height: Generally 4.2m (excess FSI charged if >4.2m, with exceptions).

Basements (Reg. 37(7))

+
  • Permitted Uses (Free of FSI for utilities): Storage, parking, AC plant, ETP, STP etc.
  • Uses Counted in FSI (1st Basement): Shops, offices, commercial (no flame kitchen).
  • Height: Min 2.4m, Max 3.9m (below soffit). Ceiling 0.6-1.2m above ground.

Podiums (Reg. 37(31))

+
  • Permitted on plots ≥1000 sqm. Max height 32m.
  • Uses: Parking, DG set, services, society office, fitness centre, pool (topmost).
  • LOS can be on podium. Can extend in front open space (clear 3m from boundary).

Safety & Sustainability Mandates

Fire Protection (Reg. 47, 48 & App. I)

+
  • Fire Tender Access: Varies (6m to 9m clear on one/two sides) based on building height and type (rehab/other).
  • Exits & Staircases: Min. 2 enclosed for high-rise. Widths as per Table 16 (e.g., Resi 1.5m-2m).
  • Refuge Area: 1st at 24m or 1st habitable floor, then every 7th floor. Area 4% of habitable floor.
  • Fire Lift: For bldgs >24m (or as per App I). Speed to reach top in 1 min.

Environmental Sustainability

+
  • Rain Water Harvesting (Reg. 62): Mandatory for plots ≥500 sqm.
  • Solar Water Heating (Reg. 63): Mandatory for Hospitals, Hotels, Hostels etc.
  • Grey Water Recycling (Reg. 64) & STP (Reg. 65): For projects under MoEF EIA.
  • Solid Waste Segregation & Treatment (Reg. 66): Separate bins. In-situ wet waste treatment. Bio-degradable plant for construction ≥20,000 sqm.
  • Tree Plantation (Reg. 67): Preserve existing. Plant 2x if felled. Min 1 tree/80sqm plot or 5 trees/100sqm RG.

Submission & Approvals

Key Submission Documents & Process (Reg. 10, 11)

+
  • Initial Submission: Notice of Intention, Plans (Key, Site, Layout, Building), Ownership docs, Specs, Supervision certs, NOCs.
  • During Construction: Notice to Start, Plinth Check, Completion Certs (Drainage, Building), Occupancy Cert.

Fast Track Approvals (Risk-Based - Reg. 60A)

+
  • Low Risk (Plot ≤150sqm, G+1/P+1): Self-certified CC by Architect/LS/Engr. Authority countersigns. No site inspection by authority.
  • Moderate Risk (Plot 151-200sqm, G+1/P+2): Self-certified CC. Plinth checking by authority.
  • Completion/OC by Architect/LS/Engr, countersigned by authority.

Special Provisions

IT/ITES, FinTech, Biotech (Reg. 33(13), 33(13A), 33(17))

+
  • IT/ITES: Addl. FSI up to 5.0 (road width linked). Premium 50% ASR. Max 20% for support services.
  • Smart FinTech: Addl. FSI up to 200% over basic (max total FSI 3.0 or 4.0). Premium 40% ASR. Min 18m road.
  • Biotech (by Public Bodies): Addl. FSI up to 5.0 (road width linked). Premium 50% ASR.

Public Parking Lots (PPL) (Reg. 33(18))

+
  • On private plots ≥1000sqm, road ≥18m. Min 50 spaces.
  • Incentive FSI: 50% of BUA of PPL handed to MCGM. Total FSI cap 3.0-4.0. Premium payable.

Heritage Conservation (Reg. 52)

+
  • Grading (I, IIA, IIB, III, Precincts). Restrictions based on grade, MHCC consultation.
  • TDR for loss of development rights.

Differently Abled Persons Provisions (Reg. 39)

+
  • Accessibility standards for public bldgs >2000sqm BUA (ramps, toilets, lifts, parking).
  • Access path mandatory for smaller public/residential buildings.

This webpage provides a summary for quick reference. Architects and Draftsmen must refer to the Original Notified DCPR-2034 of MCGM and any subsequent amendments/circulars for precise details, conditions, and interpretations before any project planning or execution.

© Mumbai DCPR-2034 Guide. Content based on official documents dated up to 07.12.2018.

```

Comments

Popular posts from this blog

NATIONAL BUILDING CODE OF INDIA 2016 Architect's Visual Guide to NBC 2016 (Detailed)