MUMBAI-DCPR
Mumbai DCPR-2034
A Comprehensive Guide for Architects & Draftsmen
Navigating the Development Control and Promotion Regulations for Greater Mumbai (Effective 13.11.2018, Updated up to 07.12.2018). This guide highlights key provisions impacting design, planning, and execution.
Core Goals & Vision of DCPR-2034
Maintain Economic Primacy
Why: Accommodate future employment, offer competitive office rentals.
How: Increase FSI, redevelop mill lands, convert industrial plots, special FSI for IT/FinTech.
Slum-Free Mumbai & Housing for All
Why: Address housing shortage, especially for EWS/LIG.
How: Inclusionary Housing, Affordable Housing on SDZ, Reserved AH plots.
Enhanced Environment & Quality of Life
Why: Tackle deficit of public open spaces & amenities.
How: Accommodation-Reservation, Compensatory TDR, Mandatory contribution from large plots.
FSI & Development Potential (Reg. 30, 31, 32)
FSI Computation Basis
+FSI is computed on gross plot area excluding road widening/DP road/regular line for base FSI. However, areas for RG, amenity open space (Reg. 14A), and reservation (Reg. 17) are included for loading Premium FSI & TDR.
New FSI Regime
+- Components: Zonal Basic FSI + Additional FSI on payment of Premium + Transferable Development Rights (TDR).
- Premium for Additional FSI (Reg. 30 Note 6): 50% of ASR (for FSI 1). Shared 25% each: State Govt., MCGM, MSRDC, Dharavi Authority. (Note: Recent notifications may have temporarily reduced these rates).
Fungible Compensatory Area (Reg. 31(3))
+- Permitted up to 35% for residential/industrial/commercial over admissible FSI.
- Premium: 50% ASR for Residential, 60% for Industrial/Commercial. Shared: 50% MCGM, 30% State Govt, 20% MSRDC. (Note: Recent notifications may have temporarily reduced these rates).
- No Premium: For rehab components in various schemes (Reg. 33(7), 33(10), etc.), existing BUA in Reg. 33(5), 33(6), 33(7B), and Reg. 33(15). 50% rebate for Reg. 33(2) (excl. private medical). No premium for Reg. 33(3) (MCGM/State Govt.).
Max Permissible FSI (Linked to Road Width - Reg. 30, Table 12)
+Island City: Up to 3.0 (Roads ≥27m)
Suburbs & Extended Suburbs: Up to 2.5 (Roads ≥27m)
Note: For roads <9m in Suburbs, total FSI is 1.0.
Transferable Development Rights (TDR - Reg. 32)
+- Generation: 2.5x area (Island City), 2.0x area (Suburbs) for surrendered reserved land/DP roads. Bonus for early surrender. 50% TDR for CRZ/BDP/HTHS areas.
- Construction Amenity TDR: (Construction Cost ASR / Land Rate ASR) * 1.5 * BUA of amenity.
- Utilization: X = (Rg/Rr) * Y.
- Slum TDR: Min 20%, Max 50% of TDR component must be Slum TDR.
Redevelopment Schemes (Reg. 33, 14B, 35)
Consent Clause
+- Cessed Buildings/MHADA (Reg. 33(7)(2)1.(a), Reg. 33(5)7)a)): 51% of occupiers.
- Private Co-op. Societies (Reg. 33(6)2.): 70% of members.
Cessed Buildings - Island City (Reg. 33(7))
+- FSI: 3.00 or Rehab FSI + 50% Incentive FSI (up to 70% for 6+ plots or high density).
- Min. Rehab Carpet Area: 27.88 sqm (300 sqft), Max up to 120 sqm (cost for excess by tenant).
- MHADA Share: Surplus BUA as per MHAD Act, 1976.
Dilapidated/Unsafe Non-Cessed Buildings (Reg. 33(7A))
+- FSI: Rehab FSI + 50% Incentive FSI (up to 70% for 6+ plots).
- Min. Rehab Carpet Area: 27.88 sqm (300 sqft), Max up to 120 sqm (cost for excess by tenant).
Existing Co-op. Housing Societies (Reg. 33(7B))
+(Excl. 33(7) & 33(7A), building age ≥30 years)
- Incentive BUA: 15% of existing BUA or 10 sqm/tenement (whichever is more), without premium.
- Balance FSI up to permissible limit via Premium FSI/TDR.
Slum Rehabilitation Schemes (SRS) (Reg. 33(10))
+- Min. Rehab Carpet Area: 27.88 sqm (300 sqft).
- Max Permissible FSI: 4.0 or (Rehab FSI + Incentive FSI), whichever is more. In-situ FSI up to 3.0 (road 9m to <13m) or 4.0 (road ≥13m).
- Incentive FSI: 0.8 to 1.35 times rehab BUA (based on scheme size & LR/RC ratio).
- Min. Density: 650 tenements/Ha (relaxable to 500/Ha). Balance tenements to SRA.
Dharavi Notified Area (DNA) (Reg. 33(10A))
+- Overall FSI 4.00.
- Rehab Carpet Area: 27.88 sqm (300 sqft) free. For existing >27.88 sqm, rehab is 37.16 sqm (400 sqft) with cost for additional 9.29 sqm.
MHADA Colonies (Reg. 33(5))
+- New Schemes (EWS/LIG/MIG): FSI 3.0 (up to 4.0 for plots >4000 sqm on roads ≥18m). Min 60% BUA for EWS/LIG/MIG.
- Redevelopment: FSI 3.0 (up to 4.0 similarly).
- Rehab Entitlement: Basic (Existing Carpet Area + 35%, min 35 sqm) + Additional (15%-45% of existing, based on plot size).
- Incentive FSI: 40%-70% of rehab area, based on LR/RC ratio.
- MHADA Share: Remaining FSI shared (MHADA gets 55%-70%).
Industrial to Residential/Commercial Conversion (Reg. 14B)
+- Premium: 20% of ASR (50% to Govt). NOC from Labour Commissioner.
- Amenity Handover: Sliding scale based on plot size (e.g., <2000 sqm: 10% open land or 5% BUA; ≥2000 sqm - 2Ha: 10% land as POS).
- 20% of residential BUA for tenements ≤50 sqm. Min 20% of residential BUA for commercial use.
Cotton Textile Mills (Reg. 35)
+(Several clauses kept in abeyance)
- Sharing (Sick/Closed Mills - Historical): 33% POS, 33% MHADA, 34% Owner.
- Chawl Rehab: 405 sq ft (37.63 sqm) carpet area. FSI 4.0 on notional plot. Surplus FSI shared.
Amenities & Open Spaces
Mandatory Contribution for Amenities (Reg. 14A)
+(For plots ≥4000 sqm in Resi/Comm zones, excl. road setback/DP road)
- Plots 4000-10,000 sqm: Handover 5% of plot area as POS.
- Plots >10,000 sqm: Handover 500 sqm + 10% of (plot area - 10,000 sqm). (50% for POS, 50% for built amenities).
- FSI of handed-over plot allowed on remaining plot.
- Transitional Policy options apply if unable to provide.
Accommodation Reservation (AR) (Reg. 17 & Table 5)
+- Plots ≥1000sqm: Owner develops X% BUA + hands over Y% land to MCGM. Develops (100-Y)% land.
- Plots <1000sqm: As above, or construct X% BUA (no separate plot) with premium for not handing Y% land.
- Refer Table 5 for X & Y values (e.g., School: X=50, Y=50; PG: Y=70).
- Developer gets BUA/TDR for construction cost: 1.5 * (Construction Rate / Land Rate) * BUA of amenity. (50% for PPL).
Layout Open Space (LOS) / RG (Reg. 27)
+- Residential/Commercial: 15% (1001-2500sqm), 20% (2501-10000sqm), 25% (>10000sqm).
- Industrial (≥1000sqm): 15%.
- Min. 60% of LOS on ground; min. 50% of this on mother earth. Balance 40% on podium.
- Structures in LOS: Utilities (LOS >400sqm, up to 10% area). Pavilions, clubs (LOS ≥1000sqm, up to 15% BUA of LOS).
Key Design & Planning Norms
Important Definitions (Reg. 2(IV))
+- FSI (61): Gross floor area / Plot area.
- BUA (19): Covered area on all floors, incl. cantilevers, excl. FSI exemptions.
- Carpet Area (22): As per RERA 2016.
- Habitable Room (71): For human habitation; excludes bath, WC, pantry, corridor etc.
- High-Rise Building (75): Height > 32m.
- Special Building (17)(n): Assembly >1000sqm BUA, Industrial, Hazardous, Wholesale, Edu/Inst/Hotel >15m or >1000sqm BUA.
Min. Road Width for Building Access (Reg. 19(2))
+- High Rise (>32m-70m): 9m. (>70m-120m): 12m. (>120m): 18m.
- Special/Assembly (>32m): 18m.
- Relaxations for specific rehab schemes.
Parking Standards (Reg. 44)
+- Residential: Varies by carpet area (e.g., 1 per 4 ten. ≤45sqm). +25% visitor. Relaxed for rehab.
- Commercial (Offices): 1 per 37.5sqm up to 1500sqm, then 1 per 75sqm.
- Retail/Malls: 1 per 40sqm up to 800sqm, then 1 per 80sqm.
- Size: Car 2.5x5.5m. Scooter 3sqm.
Marginal Open Spaces (Reg. 41)
+- Side & Rear (Plot >1000sqm & W/D >20m): Varies with height (e.g., Ht ≤32m: H/4, min 3.6m Resi, 4.5m Comm).
- Front Setback: 3m to 6m based on road width & location.
Heights of Habitable Rooms (Reg. 37(2))
+- Min Height (Flat Roof): Habitable 2.75m. Bath/WC 2.2m. Assembly/Hotel/Edu/Ind: 3.6m.
- Max Height: Generally 4.2m (excess FSI charged if >4.2m, with exceptions).
Basements (Reg. 37(7))
+- Permitted Uses (Free of FSI for utilities): Storage, parking, AC plant, ETP, STP etc.
- Uses Counted in FSI (1st Basement): Shops, offices, commercial (no flame kitchen).
- Height: Min 2.4m, Max 3.9m (below soffit). Ceiling 0.6-1.2m above ground.
Podiums (Reg. 37(31))
+- Permitted on plots ≥1000 sqm. Max height 32m.
- Uses: Parking, DG set, services, society office, fitness centre, pool (topmost).
- LOS can be on podium. Can extend in front open space (clear 3m from boundary).
Safety & Sustainability Mandates
Fire Protection (Reg. 47, 48 & App. I)
+- Fire Tender Access: Varies (6m to 9m clear on one/two sides) based on building height and type (rehab/other).
- Exits & Staircases: Min. 2 enclosed for high-rise. Widths as per Table 16 (e.g., Resi 1.5m-2m).
- Refuge Area: 1st at 24m or 1st habitable floor, then every 7th floor. Area 4% of habitable floor.
- Fire Lift: For bldgs >24m (or as per App I). Speed to reach top in 1 min.
Environmental Sustainability
+- Rain Water Harvesting (Reg. 62): Mandatory for plots ≥500 sqm.
- Solar Water Heating (Reg. 63): Mandatory for Hospitals, Hotels, Hostels etc.
- Grey Water Recycling (Reg. 64) & STP (Reg. 65): For projects under MoEF EIA.
- Solid Waste Segregation & Treatment (Reg. 66): Separate bins. In-situ wet waste treatment. Bio-degradable plant for construction ≥20,000 sqm.
- Tree Plantation (Reg. 67): Preserve existing. Plant 2x if felled. Min 1 tree/80sqm plot or 5 trees/100sqm RG.
Submission & Approvals
Key Submission Documents & Process (Reg. 10, 11)
+- Initial Submission: Notice of Intention, Plans (Key, Site, Layout, Building), Ownership docs, Specs, Supervision certs, NOCs.
- During Construction: Notice to Start, Plinth Check, Completion Certs (Drainage, Building), Occupancy Cert.
Fast Track Approvals (Risk-Based - Reg. 60A)
+- Low Risk (Plot ≤150sqm, G+1/P+1): Self-certified CC by Architect/LS/Engr. Authority countersigns. No site inspection by authority.
- Moderate Risk (Plot 151-200sqm, G+1/P+2): Self-certified CC. Plinth checking by authority.
- Completion/OC by Architect/LS/Engr, countersigned by authority.
Special Provisions
IT/ITES, FinTech, Biotech (Reg. 33(13), 33(13A), 33(17))
+- IT/ITES: Addl. FSI up to 5.0 (road width linked). Premium 50% ASR. Max 20% for support services.
- Smart FinTech: Addl. FSI up to 200% over basic (max total FSI 3.0 or 4.0). Premium 40% ASR. Min 18m road.
- Biotech (by Public Bodies): Addl. FSI up to 5.0 (road width linked). Premium 50% ASR.
Public Parking Lots (PPL) (Reg. 33(18))
+- On private plots ≥1000sqm, road ≥18m. Min 50 spaces.
- Incentive FSI: 50% of BUA of PPL handed to MCGM. Total FSI cap 3.0-4.0. Premium payable.
Heritage Conservation (Reg. 52)
+- Grading (I, IIA, IIB, III, Precincts). Restrictions based on grade, MHCC consultation.
- TDR for loss of development rights.
Differently Abled Persons Provisions (Reg. 39)
+- Accessibility standards for public bldgs >2000sqm BUA (ramps, toilets, lifts, parking).
- Access path mandatory for smaller public/residential buildings.
Comments
Post a Comment